The City of Messina announced that it is publicized in the Praetorian arrangement signed by the mayor Giuseppe Buzzanca last August 22 in his capacity as delegate for the Emergency Traffic Commissioner in which the final award to be decreed Sigenco Spa Catania for the award of the contract for the design and construction work on the intermodal logistics platform Tremestieri with the adjacent port of call - 1 ° excerpt functional.
The contract involves the design and construction of a logistics platform for ro-ro cargo to be carried through the completion of the homonymous port existing ro-ro, including the reuse of dredged material for purposes of all or part of environmental restoration (nourishment coastal areas to the north in an essential way).In particular the project, which is part of the Triennial Operational Plan 2011-2013 of the Port of Messina, includes the construction of works at sea and ashore and functional facilities to the construction of a new port infrastructure designed to service the ferry traffic Rubber Strait of Messina and receive a substantial share of ro-ro traffic motorways of the sea that now converges on Messina.
The new dock will be located just south of the existing port of Tremestieri, a locality situated about seven kilometers south of the port of Messina, which has been operational since 2006, is dedicated to the landing and embarkation of heavy vehicles and has been admitted pertaining to the territorial district of the Port of Messina by ministerial decree of 12 October 2006.
The current landing Tremestieri consists of a water surface of 17,000 square meters, of which 12,000 protected by a breakwater about 280 feet long, in which there are two berths with depths of -7 meters project dedicated to ferry ships draft of about five meters. The project involves the construction of a new water surface of 90,000 square meters with a good share of the bottom equal to -9 meters, works breakwaters, docks, yards and parking and loading of road for about 90,000 square meters and works schemes some streams and coastal defense.For the connection of the new logistics platform to the nearby motorway is expected to use the existing roads.
The city administration has announced that the successful undertaking, which the jury has awarded 90.306 points out of 100, has offered a total price of 55,841,000 Euros and inclusive of an amount based auction of 80 million euros and will have 720 days of time for the execution of the delivery date of the work.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher