Independent journal on economy and transport policy
17:54 GMT+1
This page has been automatically translated by Original news
In the port of Ghent a terminal covered with an investment of beyond 50 million euros will be realized
It will be completed to half 2020
July 30, 2018
In the Belgian port of Ghent a covered terminal for handling of producing iron and steel and other cargos with an investment of beyond 50 million euros will be realized. The new terminal will be of property of AWT GENT, joint venture instituted from the Participatiemaatschappij Vlaanderen (PMV), the society for the promotion of the investments in Flanders, and from the Epical infrastructural bottom (European Projects Investment Company), than it will take care of the planning, construction, financing and maintenance of the new terminal, that it will be managed by the terminalista group Euroports.
The new harbour terminal covered All Weather Terminal will rise beside the terminal of the ArcelorMittal Gent, the branch local of the iron and steel group ArcelorMittal that will be one of the customers of the new covered landing place.
The All Weather Terminal will have a storage capability of 60.000 tons, will be equipped of a dock of 240 linear meters, of which 200 covered meters, and ships of the gross capacity until 10 thousand will be able to land you tons. The construction of the terminal will be started in the end of this year and, second the forecasts, the work will be concluded to half 2020.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher