Independent journal on economy and transport policy
07:02 GMT+2
This page has been automatically translated by Original news
Al terminal of I go of APM Terminals have arrived others three cranes of dock
They will be able to operate on portacontainer ULCS
June 14, 2019
Al Vado Gateway, the terminal under construction in the port of Vado Ligure that will be inaugurated to year-end and will be managed by APM Terminals, has arrived others yesterday three cranes of dock that, with the first crane arrived to December 2018, complete equipment necessary ship-to-Shore the means for the operating start of the harbour system.
The operations of disembarkation of the cranes will demand between the two and three weeks and will be continuations from a phase of test that will last several months. The three which reached yesterday means are identical for specification to that already delivered: height beyond 90 meters, weight of about 1.800 tons and sbraccio in a position to maneuvering until 23 lines of container. The capacity is of 65 tons in configuration "twin lift attendant" and of 100 tons in configuration "under hook".
APM Terminals has evidenced that the dimensions of these cranes, joined to those of the grounds of the terminal and to docks very 4,5 meters over the sea level will allow to ultra operate to Vado Ligure ships of last generation ULCS (Large Ships Container).
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher