Independent journal on economy and transport policy
16:44 GMT+1
This page has been automatically translated by Original news
At the PSA Genova Pra' container terminal, the operation of cranes 90 meters high has been extended to 1,200 meters of quay
The National Civil Aviation Authority has authorized the use of these lifting vehicles also in the eastern area
November 11, 2020
PSA Genova Pra' pointed out that its terminal is now able to accommodate at the same time, without any limitation, three mega container containers of the latest generation from over 20,000 teu and a fourth smaller ship.
Since 2016 the terminal has been equipped with eight dock cranes ZPMC "goosneck" of the latest generation for which it is an investment of about 100 million euros has been made. In addition, since 2018 the old diesel-powered forecourt cranes have been replaced with 21 new electric wheeled cranes, with a investment of 35 million euros.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher