The Services Conference concluded today.
authorizes the construction in the port of Vado Ligure, at the
Header of the multipurpose platform, temporary works
preparatory to the construction of the prefabrication plant for the
caissons for the new breakwater of the port of Genoa. The intervention,
In the first phase, it will cover the implementation of five
caissons with a maximum height of 22 metres as a temporary
Protection of the dam caisson prefabrication plant
of Genoa to allow safe processing, protected from the
wave motion.