Independent journal on economy and transport policy
11:54 GMT+2
This page has been automatically translated by Original news
Fifth crane of super dock post-Panamax in Terminal XXI of the port of Sines
the next year will arrive sixth ship-to-Shore means
December 27, 2011
In the Sines Container Terminal XXI of the portuguese port of Sines post-Panamax is installed a fifth new crane of super dock that comes abreast the four already operating ones that they allow to operate on ships with container you mail on 22 lines and the portacontainer of the next generation in a position to transporting 16.000-18.000 teu. The container terminal, than currently has a dock of 730 linear meters with -17,5 backdrop meters, is operated by the PSA Sines, branch of terminalista group PSA of Singapore.
The next year Terminal XXI will be equipped of one sixth crane super ship-to-Shore post-Panamax.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher