Independent journal on economy and transport policy
20:39 GMT+1
This page has been automatically translated by Original news
Al the Congo Terminal of Pointe Noire has arrived the first two of eight new cranes ship-to-Shore
the objective is to double the traffic already in 2013 and to triple it in 2014
January 22, 2013
The Congo Terminal, the branch of the French Bolloré Africa Logistics who manages the terminal for containers of the port of Point Noire, has taken in delivery the first two of the eight new produced cranes of dock in China that will be installed in the congolese harbour system. The means of raising, that they will currently place side by side to the three cranes ship-to-Shore and the 26 reachstaker in service, will allow beginning from to increase the ability to the 100.000 terminal of teu this year. .
This year, moreover, will be put in service a new dock of 800 linear meters with a draught of 15 meters that the total surface of the terminal to 38 hectares will increase.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher