Independent journal on economy and transport policy
02:09 GMT+1
This page has been automatically translated by Original news
Eleven new cranes for the Slovenian port of Koper
the order includes two means of super dock post-Panamax that will be able to operate on portacontainer from 14.000 teu
November 6, 2015
Luka Koper has announced that it is acquiring 11 new cranes of large-capacity for handling of the container in sight of the extension of the Pier of the Slovenian port and with the objective to increase the ability to annual handling of the container terminal of the port of call to the aim to reach the 1,3 million one teu in 2020.
The new means of raising will include two new cranes of super dock post-Panamax that will be able to operate on ships of the ability until 14.000 teu. The company has remembered that current the four cranes ship-to-Shore of the container terminal of the port of Koper can operate on portacontenitori of the ability until 8.000 teu, with container disposed over the bridge on 18 lines and nine shooting in height, while the two new super cranes post-Panamax will be able to operate on disposed ships with container on 24 lines and 11 shooting. The two new cranes of dock will be operating from june 2017. The order includes two crane to portal on rubber.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher