Independent journal on economy and transport policy
07:39 GMT+1
This page has been automatically translated by Original news
Noatum upgrades means of raising of the container terminal of Valencia in order to serve the great ships at best
Three cranes over super post-Panamax removed by the terminal of the group to Malaga, where two currently installed super means will reach post-Panamax Valencia
May 30, 2016
Noatum has decided to upgrade the container terminal that manages to the Muelle Príncipe Felipe of the port of Valencia equipping it of ulterior three cranes of dock over super post-Panamax, means of raising, called also ultra super post-Panamax or ultra post-Panamax or still with other names, that they are able to operate on portacontainer of the ability to beyond 14.000 teu. The Spanish harbour group has explained that the decision is assumed in consideration of the increasing dimension of the ships that climb to Valencia.
The two cranes ship-to-Shore over super post-Panamax already are removed by the terminal that the same Noatum group manages in the port of Malaga, in which two super cranes STS will reach in substitution post-Pamanax, that is in a position to serving portacontenitori of the ability until 14.000 teu about, that they will be to they time removed from the terminal of the group to Valencia, where will arrive a third crane afterwards over super post-Panamax coming always from Malaga, terminal - this last one - whose activity is reindirizzata to the traffic of the liquid and solid bulk, in particular of food, and the rotabili.
With the completion of the reorganization of means of raising inside of the harbour terminals of the group, on the 1,470 linear meters of dock that constitute the landing place of the Noatum to Valencia they will be operating 13 cranes over super post-Panamax in a position to at the same time enlivening four portacontainer of the length until 300 meters and with container you mail on 22 lines.
Moreover Noatum has remembered that in the next weeks Coast of the port of Valencia will be inaugurated the widening of own concession to the Muelle de, with ulterior 540 linear meters of dock. Successively three cranes of dock currently installed on the Muelle Príncipe Felipe will be transferred to the Muelle de Coast that within the next July so will be equipped with four cranes STS.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher