Independent journal on economy and transport policy
05:02 GMT+1
This page has been automatically translated by Original news
Order to Fincantieri for two more ships for the offshore wind sector
By October 2021 the same client, Norwind Offshore, had commissioned two first CSOV
April 14, 2022
Fincantieri explained that the project is based on a highly versatile platform for support operations sustainable in offshore wind farms, which stands out for its on-board logistics, safety, comfort and operability superior. The ships will have a length of 85 meters, they will be able to embark 87 people and will be equipped with a mobile walkway, with elevator, compensated with respect to wave motion, and a system for the transfer from the boat to adjustable height. Units will be prepared for the installation of a battery system.
The first ship will be built and Braila, Romania, for be set up and delivered in Brattvaag, Norway, in the first quarter of 2024. The second will be built and delivered to Vung Tau, Vietnam, with delivery expected in the second quarter of 2025.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher