Independent journal on economy and transport policy
12:56 GMT+1
This page has been automatically translated by Original news
Christened before the 30 new portacontainer of the series L ordered from Evergreen Line
Samsung Heavy Industries has completed the construction of the wind farm installation vessel larger of the world
July 26, 2012
Yesterday the Ever Lambent is christened, before the 30 new portacontainer of the series L ordered from the taiwanese company Evergreen Line. The ship, that container has a cargo ability 8.452 pairs to teu, is constructed by the Samsung Heavy Industries South Korean to which Evergreen it has ordered 20 portacontainer of series L with delivery within 2014, while the others ten ships of the same series are commissioned to Taiwan Shipbuilding Corporation with delivery between 2013 and 2015.
The Ever Lambent is long 334 meters, wide 45,8 meters, has a draught of 14,2 meters and connections for 942 container refrigerator. The ship, that it has a speed of 24,5 knots, is of Marine properties of the branch British Evergreen (UK) Ltd. and the next month will be introduced in the services between the Far East and Europe.
While yesterday Samsung Heavy Industries has completed the construction of the Pacific Bogey, wind farm installation vessel (the WIV) larger of the world that will be delivered to the Swire Offshore Pacific. The ship for the installation of wind systems can transport and install 12 units of the power of 3,6 MW.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher