Independent journal on economy and transport policy
08:02 GMT+1
This page has been automatically translated by Original news
Fincantieri has delivered a semisubmersible floating platform for the RosRAO Russian
Ordered two Articulated Tug Barge to the branch American Fincantieri Marine Group
March 4, 2016
Yesterday in the ship yard of Muggiano (La Spezia) of the Fincantieri group Itarus, the constructed semisubmersible floating platform for the Russian RosRAO, the Federal Enterprise is delivered State Unitarian for the treatment of the radioactive wastes. The contract for the construction of the unit was stipulated between the Ministry of the Italian economic Development, RosRAO and Fincantieri in November 2013 in occasion of the bilateral encounter Italy-Russia, svoltosi to Trieste. The store clerk makes for dismantling keeps on the agreement of collaboration of 2003 which signed between the Russian government and that Italian of nuclear submarines and the sure management of the radioactive wastes and the nuclear fuel, defined in the picture of the Global project Partnership, started in occasion of the reunion of the G8 in 2002 in Canada.
Itarus, along than 79 meters, little more wide almost 29 with a gross capacity of 3000 tons, constructed in the integrated yard of Riva Trigoso-Muggiano with the support of that of Palermo, under the supervision of the Russian Maritime Register of Shipping, will be destined to the transport of the compartments of reactor of submarines nuclear dismessi from Russian Marina Militare from the area of storage of Sayda Bay to the yard of Nerpa (and), vice versa before to the kola peninsula, in the Barents Sea. The unit is distinguished for the maximum immersion of 24,5 meters, approachable during the operations of breaking in of the cargo in basin, thanks to a system distributed on 45 cases for a total of 25.000 cubic metres of ballast water enlivened from four pumps of the capacity of 2.000 cubic metres/now. The unit will be equipped moreover of able inhabited spaces on board to accommodate a crew of six people.
While Fincantieri Marine Group (FMG), branch American of the Fincantieri group, has acquired a store clerk for the construction of a tug ATB with option for a second unit, with delivery respective in 2017 and 2018. Draft of an order for means Articulated Tug Barge (ATB), constituted from a system tug-barge for the transport of producing oil or chemical, that they will be constructed in the ship yard Fincantieri Bay Shipbuilding (FBS) of Sturgeon Bay. New means ATB will be long 176 meters, wide 24 meters and will have an ability to 185.000 barrels.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher