Independent journal on economy and transport policy
07:28 GMT+1
This page has been automatically translated by Original news
Completed the work of modernization of the dock of the Polisettoriale Pier of the port of Taranto
By July they will be disponibili1.500 linear meters of approaches and the rear large square
June 7, 2017
The work of modernization of the dock of mooring to the Polisettoriale Pier of the port of Taranto is carried to term, cost participations 75 million euros that have involved the adaptation of 1.200 meters of dock to the new backdrop of -16,50 meters and to the sollicitations deriving from the ships of last generation and the cranes of dock.
The Authority of Harbour System of the Ionian Sea has announced that, at the same time to the execution of the work, the new dock of the Polisettoriale Pier is executed a first phase of the dredgings of the next area having carried a belt of about 20 meters to the depth of -16,50 meters.
The agency has specified that, to the term of the test that will happen by July, they will be immediately available, besides the rear large square, 1,500 linear meters of dock, of which already 600 tested and already operating, 600 under test and 300 meters not object of work and already operating, that they will be usable from the interested enterprises to acquire in concession areas and dock.
The authority has remembered that, moreover, from the next December, as soon as finished the overwhelmed bathtub of, they will begin the ulterior operations of dredging until -16.50 meters of the before part the new dock, of the corridor of income and the circle of evolution of the ships. The remaining part of the dock of the Polisettoriale Pier will be dredged until -15 meters.
In concomitanza with the conclusion of such work, past monday is given start to the relative work to the "requalification of the docks and the large squares in root to the Polisettoriale Pier" for an amount of 15 million euros. The restoration of the functionality of the dock structures will be carried out that need of extraordinary the requalification, maintenance operations of the areas to earth and the adaptation of the wirings and water-drainage of meteoric waters to the enforced norm.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher