TEN_-_Vorhaben (PP1) Nr.1 ,Abschnitt Kufstein-Innsbruck; Umbau Terminal Worgl (AP - €5,000,000) |
|
Terminal Wien Inzersdorf Planung, (17 PP - Section: Wien AP) (- €2,140,000) |
|
Greening European transportation Infrastructure AP for electric vehicles* (- €4,950,000) |
|
Studies on improving the freight corridor concept by using telematic applications for freight, and methods, tools and procedures developed by RNE AP for rail corridors (- €1,211,773) |
|
FAB EG implementation of static Fläche MAP ATM/FAB of responsibility scenario* (- €1,447,740) |
|
|
BELGIUM |
|
The Albert Canal: rebuilding the Briegden Oelegem and das AP bridges (- €1,571,532) |
|
Greening European transportation Infrastructure AP 4,950,000 for electric vehicles* (- €) |
|
Air Traffic €13,781,475, Management Systems, Functional Airspace Block Europe Central (FABEC MAP ATM/FAB) - (-) |
|
MoS 24 €2,452,500,- ICT co. PP24 Mediterranean MoS* (MAP MoS - based promotion centre for integrating into) |
|
LNG Infrastructure in MAP MoS of filling stations and deployment ships* (- €9,569,500) |
|
Deployment Inland AIS in Flanders The Netherlands* (MAP RIS - of transponders and €777,000) |
|
Implementation RIS in Flanders II (MAP RIS - of €597,120) |
|
|
CYPRUS |
|
MIELE* (MAP MoS - €7,998,250) |
|
|
CZECH REPUBLIC |
|
FAB EG implementation of static Fläche MAP ATM/FAB of responsibility scenario* (- €1,447,740) |
|
|
DENMARK |
|
Greening European transportation Infrastructure AP 4,950,000 for electric vehicles* (- €) |
|
North European Functional Airspace Block (NEFAB) development €4,094,370,- preparation for implementation* (MAP ATM/FAB -) |
|
LNG Infrastructure in MAP MoS of filling stations and deployment ships* (- €9,569,500) |
|
Motorway Sea Rostock-Gedser* (MAP MoS - of the €24,494,874) |
|
The Baltic Sea MAP MoS hub and spokes project* (- €24,846,900) |
|
MonaLisa* (MAP MoS - €11,234,003) |
|
|
ESTLAND |
|
North European Functional Airspace Block (NEFAB) development €4,094,370,- preparation for implementation* (MAP ATM/FAB -) |
|
The Baltic Sea MAP MoS hub and spokes project* (- €24,846,900) |
|
|
FINLAND |
|
Railway Oulu (AP - €4,540,000) |
|
E18 Helsinki AP studies (- €1,250,000) |
|
Railway Kokkola-Ylivieska, PPP AP, procurement process (- €2,150,000) |
|
North European Functional Airspace Block (NEFAB) development €4,094,370,- preparation for implementation* (MAP ATM/FAB -) |
|
MonaLisa* (MAP MoS - €11,234,003) |
|
|
FRANCE |
|
Design zu Port Dunkirk (AP - and environmental studies regarding the creation of multimodal transport system at the of €1,850,000) |
|
Etudes mise pour sie Vb au gabarit de der Oise Compiegne et Creil (AP - entre €1,534,331) |
|
Adaptation de der Mulhouse et ligne existante entre die Grenzen zu großem TGV von ICE der Mulhouse-Mullheim (Fribourg AP) en vue de das Circulation de trains vitesse () ou intercity express () sur axe (- €720,000) |
|
MoS 24 €2,452,500,- ICT co. PP24 Mediterranean MoS* (MAP MoS - based promotion centre for integrating into) |
|
Fluss Services von SIF II MAP RIS information II () (- €1,160,080) |
|
|
GERMANY |
|
Bau Moselschleuse Trier (Mosel AP) der zweiten (- €2,402,220) |
|
MIELE* (MAP MoS - €7,998,250) |
|
Motorway Sea Rostock-Gedser* (MAP MoS - of the €24,494,874) |
|
|
GREECE |
|
Remaining Arachovitika Patras Athens-Patras studies for the section from until the new port of the railway Line (AP - €1,250,000) |
|
Completion Ionian Highway of the study (Western Kakavia (AP - axis) from the end of concession to €2,000,000) |
|
Monitoring Operation Services Motorways Sea (MOS4MOS MAP MoS) and for of the * (- €2,825,752) |
|
|
HUNGARY |
|
FAB EG implementation of static Fläche MAP ATM/FAB of responsibility scenario* (- €1,447,740) |
|
|
IRELAND |
|
UK-Ireland FAB MAP ATM/FAB development of high level sectors* (- €1,154,378) |
|
|
ITALY |
|
MXPT2LINK-UP - Rail Link between Terminals 1 2 and at Malpensa Airport (AP - €1,296,490) |
|
Projekt von dem intermodale Knoten von dem Internationalen Flughafen von Catania Fontanarossa (AP - €1,000,000) |
|
Adriatic Gateway: the improvement of northern Adriatic zu AP ports and the building of strategic corridor for multimodal transport (- €1,000,000) |
|
MoS 24 €2,452,500,- ICT co. PP24 Mediterranean MoS* (MAP MoS - based promotion centre for integrating into) |
|
MIELE* (MAP MoS - €7,998,250) |
|
Monitoring Operation Services Motorways Sea (MOS4MOS MAP MoS) and for of the * (- €2,825,752) |
|
ITS Adriatic bestraft MAP MoS gateway* (- €1,442,500) |
|
Studies RIS Northern Italy Waterway System (MAP RIS - for the development of the operability along the €2,930,000) |
|
|
LATVIA |
|
North European Functional Airspace Block (NEFAB) development €4,094,370,- preparation for implementation* (MAP ATM/FAB -) |
|
|
LUXEMBOURG |
|
Greening European transportation Infrastructure AP 4,950,000 for electric vehicles* (- €) |
|
|
MÖRTEL |
|
MoS 24 €2,452,500,- ICT co. PP24 Mediterranean MoS* (MAP MoS - based promotion centre for integrating into) |
|
|
THE NETHERLANDS |
|
Third Track Zevenaar-German AP border (- €802,500) |
|
Extension railway Yard Maasvlakte West- Phase 1 (AP - €1,476,600) |
|
Implementation scheint study to zu maritime berauben Partnership to improve access to the ten-t Network Amsterdam (AP - at €1,745,755) |
|
Greening European transportation Infrastructure AP 4,950,000 for electric vehicles* (- €) |
|
Deployment Inland AIS in Flanders The Netherlands* (MAP RIS - of transponders and €777,000) |
|
|
POLAND |
|
Studium wykonalnosci modernizacji die Katowickiego Wezla Kolejowego rozbudowy. Study Katowice AP on the modernisation and extension of the railway junction (- €3,500,000) |
|
Pilota?owe Wdro?enie RIS Dolnej Odry. Pilot RIS In Poland (MAP RIS - implementation of first services and applications €1,600,000) |
|
|
PORTUGAL |
|
Estudos relativos ao eisenbahn Desnivelamento Alcântara - PP8 de. Studies leading to the detailed Design Alcântara AP and specifications for the construction of the building of the grade separation (- €1,630,052) |
|
Estudos gebe ich relativos ao Desenvolvimento PPP programa de gebe von hohem Portugal (Projecto RAV) PP3, PP19 projecto de implementacao rede eisenbahn de velocidade em - und. Study PPP in Portugal (AP - supporting the programme for high speed rail implementation €974,500) |
|
MIELE* (MAP MoS - €7,998,250) |
|
|
SLOVAKIA |
|
FAB EG implementation of static Fläche MAP ATM/FAB of responsibility scenario* (- €1,447,740) |
|
|
SLOWENIEN |
|
Preparation Implementation of the plan for upgrading of the section of the railway Line Poljcane-Pragersko (AP - €1,100,000) |
|
Izdelava Dra?enci-MMP Gruskovje projekta za pridobitev gradbenega dovoljenja za avtocestni odsek. Study zu Link Drazenci-Gruškovje AP for motorway along the international border crossing (- €2,022,500) |
|
FAB EG implementation of static Fläche MAP ATM/FAB of responsibility scenario* (- €1,447,740) |
|
Monitoring Operation Services Motorways Sea (MOS4MOS MAP MoS) and for of the * (- €2,825,752) |
|
ITS Adriatic bestraft MAP MoS gateway* (- €1,442,500) |
|
|
SPAIN |
|
Muelle Prat rail Terminal (AP - €2,913,499) |
|
Redacion de proyectos de adecuacion en las terminals: Valencia de San Madrid y otras actaciones. Drafting in AP projects railway freight terminals (- €2,585,000) |
|
HOHES PP3 Madrid zettle ich velocidad, Madrid an: estudios (Phase I AP) (- €5,000,000) |
|
L.A.V. Madrid Vasco-Frontera Francesa: redaccion de proyectos constructivos. HSR Line Madrid Country- border: drafting of construction projects (AP - €2,350,385) |
|
L.A.V. Granada: estudios y proyectos. HSR Granada: studies and projects (AP - €2,247,711) |
|
Greening European transportation Infrastructure AP 4,950,000 for electric vehicles* (- €) |
|
MIELE* (MAP MoS - €7,998,250) |
|
Monitoring Operation Services Motorways Sea (MOS4MOS MAP MoS) and for of the * (- €2,825,752) |
|
|
SWEDEN |
|
Completion Haparanda of the Line €2,960,000,- an important Link in Bothnian Corridor (AP - the) |
|
North European Functional Airspace Block (NEFAB) development €4,094,370,- preparation for implementation* (MAP ATM/FAB -) |
|
The Baltic Sea MAP MoS hub and spokes project* (- €24,846,900) |
|
MonaLisa* (MAP MoS - €11,234,003) |
|
|
UNITED KINGDOM |
|
Felixstowe Rail Terminal €5,000,000,- improving intermodal Transfer PP26 (AP - and removing bottleneck on) |
|
Port Salford AP (enabling studies and works) (- €998,125) |
|
Priority Axis 26: Nuneaton North Chord Kennett and King AP works (- €4,994,333) |
|
UK-Ireland FAB MAP ATM/FAB development of high level sectors* (€1,154,378) |