AUSTRIA |
|
TEN-Vorhaben Nr.1 (PP1), Abschnitt Kufstein-Innsbruck; Umbau Terminal Worgl (AP - €5,000,000) |
|
Terminal Wien Inzersdorf Planung, (17 PP - Section: Vienna-Salzburg) (AP - €2,140,000) |
|
Greening European transportation infrastructure for electric vehicles* (AP - €4,950,000) |
|
Studies on improving the freight corridor concept by using telematic applications for freight, and methods, tools and procedures developed by RNE for rail corridors (AP - €1,211,773) |
|
FAB EC implementation of static area of responsibility scenario* (MAP ATM/FAB - €1,447,740) |
|
|
BELGIUM |
|
The Albert Canal: rebuilding the Briegden and Oelegem bridges (AP - €1,571,532) |
|
Greening European transportation infrastructure for electric vehicles* (AP - € 4,950,000) |
|
Air Traffic Management Systems - Functional Airspace Block Europe Central (FABEC) (MAP ATM/FAB - €13,781,475) |
|
MoS 24 - INFORMATION AND COMMUNICATION TECHNOLOGY based Co-modality promotion centre for integrating PP24 into Mediterranean MoS* (MAP MoS - €2,452,500) |
|
LNG infrastructure of filling stations and deployment in ships* (MAP MoS - €9,569,500) |
|
Deployment of Inland AIS transponders in Flanders and The Netherlands* (MAP RIS - €777,000) |
|
Implementation of RIS in Flanders II (MAP RIS - €597,120) |
|
|
CYPRUS |
|
MIELE* (MAP MoS - €7,998,250) |
|
|
CZECH REPUBLIC |
|
FAB EC implementation of static area of responsibility scenario* (MAP ATM/FAB - €1,447,740) |
|
|
DENMARK |
|
Greening European transportation infrastructure for electric vehicles* (AP - € 4,950,000) |
|
North European Functional Airspace Block (NEFAB) development - preparation for implementation* (MAP ATM/FAB - €4,094,370) |
|
LNG infrastructure of filling stations and deployment in ships* (MAP MoS - €9,569,500) |
|
Motorway of the Sea Rostock-Gedser* (MAP MoS - €24,494,874) |
|
The Baltic Sea hub and spokes project* (MAP MoS - €24,846,900) |
|
MonaLisa* (MAP MoS - €11,234,003) |
|
|
ESTONIA |
|
North European Functional Airspace Block (NEFAB) development - preparation for implementation* (MAP ATM/FAB - €4,094,370) |
|
The Baltic Sea hub and spokes project* (MAP MoS - €24,846,900) |
|
|
FINLAND |
|
Railway Seinajoki-Oulu (AP - €4,540,000) |
|
E18 Helsinki-Vaalimaa studies (AP - €1,250,000) |
|
Railway Kokkola-Ylivieska, PPP procurement process (AP - €2,150,000) |
|
North European Functional Airspace Block (NEFAB) development - preparation for implementation* (MAP ATM/FAB - €4,094,370) |
|
MonaLisa* (MAP MoS - €11,234,003) |
|
|
FRANCE |
|
Design and environmental studies regarding the creation of to multimodal transport system at the Port of Dunkirk (AP - €1,850,000) |
|
Etudes pour put it au gabarit Vb de the Oise entre Compiegne ET Creil (AP - €1,534,331) |
|
Adaptation de ligne existante entre Mulhouse ET the frontiers en vue de the circulation de trains to great vitesse (TGV) ou of inter-city express (ICE) sur axe the Mulhouse-Mullheim (Fribourg) (AP - €720,000) |
|
MoS 24 - INFORMATION AND COMMUNICATION TECHNOLOGY based Co-modality promotion centre for integrating PP24 into Mediterranean MoS* (MAP MoS - €2,452,500) |
|
Fluvial Services of information II (SIF II) (MAP RIS - €1,160,080) |
|
|
GERMANY |
|
Bau der zweiten Moselschleuse Trier (Mosel) (AP - €2,402,220) |
|
MIELE* (MAP MoS - €7,998,250) |
|
Motorway of the Sea Rostock-Gedser* (MAP MoS - €24,494,874) |
|
|
GREECE |
|
Remaining studies for the section from Arachovitika until the new Patras port of the Athens-Patras railway linens (AP - €1,250,000) |
|
Completion of the study Ionian Highway (Western axis) from the end of concession to Kakavia (AP - €2,000,000) |
|
Monitoring and Operation Services for Motorways of the Sea (MOS4MOS) * (MAP MoS - €2,825,752) |
|
|
HUNGARY |
|
FAB EC implementation of static area of responsibility scenario* (MAP ATM/FAB - €1,447,740) |
|
|
IRELAND |
|
UK-Ireland FAB development of high level sectors* (MAP ATM/FAB - €1,154,378) |
|
|
ITALY |
|
MXPT2LINK-UP - Rail link between 2 terminals 1 and at Malpensa Airport (AP - €1,296,490) |
|
Project of the intermodal node of the International Airport of Catania Fontanarossa (AP - €1,000,000) |
|
Adriatic Gateway: the improvement of northern Adriatic ports and the building of to strategic corridor for multimodal transport (AP - €1,000,000) |
|
MoS 24 - INFORMATION AND COMMUNICATION TECHNOLOGY based Co-modality promotion centre for integrating PP24 into Mediterranean MoS* (MAP MoS - €2,452,500) |
|
MIELE* (MAP MoS - €7,998,250) |
|
Monitoring and Operation Services for Motorways of the Sea (MOS4MOS) * (MAP MoS - €2,825,752) |
|
ITS Adriatic fines-port gateway* (MAP MoS - €1,442,500) |
|
Studies for the development of the RIS operability along the Northern Italy Waterway System (MAP RIS - €2,930,000) |
|
|
LATVIA |
|
North European Functional Airspace Block (NEFAB) development - preparation for implementation* (MAP ATM/FAB - €4,094,370) |
|
|
LUXEMBOURG |
|
Greening European transportation infrastructure for electric vehicles* (AP - € 4,950,000) |
|
|
MALTA |
|
MoS 24 - INFORMATION AND COMMUNICATION TECHNOLOGY based Co-modality promotion centre for integrating PP24 into Mediterranean MoS* (MAP MoS - €2,452,500) |
|
|
THE NETHERLANDS |
|
Third Track Zevenaar-German border (AP - €802,500) |
|
Extension railway yard Maasvlakte West Phase 1 (AP - €1,476,600) |
|
Implementation study to preseems to maritime Public-Private Partnership to improve access to the TRIES Network at Amsterdam (AP - €1,745,755) |
|
Greening European transportation infrastructure for electric vehicles* (AP - € 4,950,000) |
|
Deployment of Inland AIS transponders in Flanders and The Netherlands* (MAP RIS - €777,000) |
|
|
POLAND |
|
Studium wykonalnosci modernizacji rozbudowy the Katowickiego Wezla Kolejowego. Study on the modernisation and extension of the Katowice railway junction (AP - €3,500,000) |
|
Pilota?owe wdro?enie RIS Dolnej Odry. Pilot implementation of first RIS services and applications In Poland (MAP RIS - €1,600,000) |
|
|
PORTUGAL |
|
Estudos relativos ao railway desnivelamento de Alcântara - PP8. Studies leading to the detailed design and specifications for the construction of the building of the Alcântara grade separation (AP - €1,630,052) |
|
Estudos relativos ao desenvolvimento I give programa de PPP I give projecto de implementacao from rede railway de high velocidade em Portugal (Projecto RAV) - PP3 and PP19. Study supporting the PPP programme for high speed rail implementation in Portugal (AP - €974,500) |
|
MIELE* (MAP MoS - €7,998,250) |
|
|
SLOVAKIA |
|
FAB EC implementation of static area of responsibility scenario* (MAP ATM/FAB - €1,447,740) |
|
|
SLOVENIA |
|
Preparation of the Implementation plan for upgrading of the section of the railway linens Poljcane-Pragersko (AP - €1,100,000) |
|
Izdelava projekta za pridobitev gradbenega dovoljenja za avtocestni odsek Dra?enci-MMP Gruskovje. Study for to motorway link along the Drazenci-Gruškovje international border crossing (AP - €2,022,500) |
|
FAB EC implementation of static area of responsibility scenario* (MAP ATM/FAB - €1,447,740) |
|
Monitoring and Operation Services for Motorways of the Sea (MOS4MOS) * (MAP MoS - €2,825,752) |
|
ITS Adriatic fines-port gateway* (MAP MoS - €1,442,500) |
|
|
SPAIN |
|
Muelle Prat rail terminal (AP - €2,913,499) |
|
Redacion de proyectos de adecuacion en las terminals: Valencia-Fuente de Saint Luis-Madrid-Vicalvaro y otras actaciones. Drafting projects in railway freight terminals (AP - €2,585,000) |
|
High PP3 velocidad Madrid-Lisboa, I cook up Madrid-Oropesa: estudios (phase I) (AP - €5,000,000) |
|
L.A.V. Madrid-Pais Vasco-Frontera Francesa: redaccion de proyectos constructivos. HSR Line Madrid-Basque Country-French border: drafting of construction projects (AP - €2,350,385) |
|
L.A.V. Bobadilla-Granada: estudios y proyectos. HSR Bobadilla-Granada: studies and projects (AP - €2,247,711) |
|
Greening European transportation infrastructure for electric vehicles* (AP - € 4,950,000) |
|
MIELE* (MAP MoS - €7,998,250) |
|
Monitoring and Operation Services for Motorways of the Sea (MOS4MOS) * (MAP MoS - €2,825,752) |
|
|
SWEDEN |
|
Completion of the Haparanda Line - an important link in the Bothnian Corridor (AP - €2,960,000) |
|
North European Functional Airspace Block (NEFAB) development - preparation for implementation* (MAP ATM/FAB - €4,094,370) |
|
The Baltic Sea hub and spokes project* (MAP MoS - €24,846,900) |
|
MonaLisa* (MAP MoS - €11,234,003) |
|
|
UNITED KINGDOM |
|
Felixstowe Rail Terminal - improving intermodal transfer and removing bottleneck on PP26 (AP - €5,000,000) |
|
Port Salford (enabling studies and works) (AP - €998,125) |
|
Priority Axis 26: Nuneaton North Chord and Kennett king-signalling works (AP - €4,994,333) |
|
UK-Ireland FAB development of high level sectors* (MAP ATM/FAB €1,154,378) |