Independent journal on economy and transport policy
14:59 GMT+1
This page has been automatically translated by Original news
the Liguria Region drafts the directory of priority infrastructures to deliver to minister Delrio
Giampedrone: the minister has specifically asked to us to reduce the package of the participations
September 18, 2015
Today the regional committee of the Liguria has approved of the containing deliberation all the priority infrastructural works considered to deliver to the minister of Infrastructures and the Transports, Graziano Delrio. "The today's document - the city council member to Infrastructures has explained, Giacomo Giampedrone - is yields of a distance which got ahead with the ministry of Infrastructures and the minister Delrio who has specifically asked to us to reduce the package of the participations, against the location of the consequent financings. Therefore we have made a recognition on all the Liguria characterizing those more meaningful works. To the base of which there is that concreteness that the minister deriving also from the availability has asked us for the projects, in great part of definitive level. Therefore we have carried out a recognition on the priorities fundamental and rimodulato the projects, so that they can be financed for a total amount of 2,7 billion".
The directory includes the following considered infrastructures strategic of which he has himself the planning:
Third railway Pass (continuity of the yards and financing to complete for 4 billion).
Railway doubling of the Final line - Andora (in the within of Genoa-Ventimiglia) to finance with 1,4 billion
Completion of the railway Node of Genoa (stopped Cornigliano-New draft Airport - Sestri West) to finance with 65 million
Highway tunnel of the Val Fontanabuona to finance with 350mln of euro
Operas of completion of the lottery of the Aurelia New of Savona, to finance with 50 mln
Operas of completion of 3° the lottery of varying of
New Bridge of Ceparana - Santo Stefano al Mare, to finance with 12 mln
Aurelia second of Imperia, to finance with 300 million, divisible in lotteries
Aurelia second of Sanremo - completion, to finance with 300 mln, divisible in lotteries
Prosecuzione metropolitan line of Genoa, Brigole draft - Martinez, to finance with 30 million
Highway interchange of Bossarino in the Municipality of Vado Ligure: to finance with 50 mln of euro
Aurelia second between Alassio and Andora with 101 mln.
Prosecuzione of the coastal Park - bicycle track of the West, to finance with 40 million
Completion of the doubling of the railway line Pontremolese for the works to plan in the territories of the Tuscany and Emilia Romagna
The works for which the financing of the planning is demanded are:
Print blue di Renzo Piano (I rearrange total of the within of the naval Repairs and the Fair, comprised between the ancient Port and the River mouth, with the reorganization of the section of shipbuilding) and the New Outer dam of the Port of Genoa (planning 50 mln)
New outer dam in the basin of I go to Savona (3 mln of euro)
City and terminal Waterfront cruises of the Port of (10 mln)
I rearrange road and mass in safety of the valley of the Entella
Modernization of civil servant 45
Prosecuzione of the aurelia second of Savona
Planning of the priority drafts of the Aurelia second of the West from Liguria
Planning of IV the lottery of the aurelia second of and the highway interchange of Beverino
Highway interchange of varying Fornola and Aurelia of Arcola
Civil servant n. 28 of the Glues of Nava draft Pontedassio - Imperia
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher