Independent journal on economy and transport policy
07:30 GMT+2
This page has been automatically translated by Original news
Completed in Shanghai the construction of a dry dock for the construction of large cruise ships
The property is 740 metres long and 76 metres wide
June 26, 2020
The construction of the basin, designed by China Shipbuilding NDRI Engineering Co. of the CSSC Group and implemented by ccCC Third Engineering Bureau Co. of China Communications Construction Group Co. (CCCC), was carried out in 20 months and involved length from 540 to 740 meters the length of a basin 76 meters wide.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher