Independent journal on economy and transport policy
23:34 GMT+2
This page has been automatically translated by Original news
Started in experimental phase the operating activity on the Muelle Prat of the port of Barcelona
The container terminal is managed by the Tercat of the Hutchison Port Holdings group
July 3, 2012
With the landing place of portacontainer the MSC Esha the operating activity of the new container is started in experimental phase terminal on the Muelle Prat of the port of Barcelona that is managed by the Terminal Catalunya (Tercat), society of the group Hutchison Port Holdings (HPH). In occasion of the port of call of the ship of the Mediterranean Shipping Company (MSC) 436 are enlivened container with a medium productivity of 30 handlings for crane to the hour.
The new terminal, that the next year will totally become operating, will cover an area of 100 hectares and will have a dock of 1.500 linear meters with depth of the -16,5 backdrop meters.
- Via Raffaele Paolucci 17r/19r - 16129 Genoa - ITALY
phone: +39.010.2462122, fax: +39.010.2516768, e-mail
VAT number: 03532950106
Press Reg.: nr 33/96 Genoa Court
Editor in chief: Bruno Bellio No part may be reproduced without the express permission of the publisher